
LJM Solutions fits solar PV, battery storage and EV charging across Sheffield and South Yorkshire, using our own engineers rather than subcontracted crews. In a city built across hillsides, the layout gets decided on site and not from a satellite picture. We deal with Northern Powergrid and the council permits on your behalf, and every finished system is issued with an MCS certificate.
Looking at solar panel installers in Sheffield? Ask what they made of the hill behind your house.
Sheffield climbs from about 40 metres above sea level in Attercliffe to about 240 metres in Crookes, and you might expect that to change what a roof generates. It barely does. Modelled with the European Commission’s PVGIS tool, an unshaded south facing pitch gives around 950 kWh per kWp a year in Attercliffe and 940 in Crookes. Lodge Moor, out on the western edge, drops to about 900. Direction matters far more than height: the same panels on an east or west slope lose about a fifth. Altitude shows up in the structure instead. Wind and snow loads rise on high, exposed roofs, so the fixings there get calculated for that site and not lifted from a standard kit list.
Almost every solar quote promises similar panels and similar savings. The useful differences appear when the roof does not match the estimate.
The people who survey, design, fit and commission your system all work for us. If the survey finds a neighbour's ridge shading your lower panels, that goes straight into the design, rather than surfacing on installation day between a sales office and a subcontractor.
Some Sheffield roofs are poor candidates. A slope in shadow from the houses above, a covering close to replacement or a north facing pitch can all be reasons to wait or walk away. We will say so, and we show the generation figures behind that advice so you can test the sums yourself.
A string drops out, an inverter reports a fault, pigeons move in under the array. We monitor, service and repair our own installations, and we take on systems left behind by installers that no longer trade. Warranties are registered at handover, so the paperwork exists when you need it.
Before you sign with anyone, check the MCS certificate, ask who employs the people doing the work, and find out exactly who answers the phone in year three. Those answers will tell you more than the brochure does.
My husband and I are over the moon with the experience we have received from LJM solutions! We were unsure whether it was going to be right for us but all questions we had from the offset were answered by Chloe quickly and in detail. Jay came out for our install and was very professional and efficient and we can't believe the process only took 2 weeks from start to finish!
I chose LJM Solutions as they were I a local family business, and because they were / MCS certified, and I am so glad I did. Josh, one of the bosses has been out to check everything is I working perfectly and explain how I can monitor / everything on my new app. They made me feel part of their family. Thank you so much.
This solar energy/electrical team are outstanding and highly professional. We were amazed at the amount of work they achieved in one day.
Very Trustworthy- So pleased with this company friendly reliable really good for the money...what a lovely bunch of people... Highly satisfied and Highly recommend.
A lot of Sheffield housing steps up or across a hillside, and that shapes the job. On terraced streets in Walkley, Crookes and Heeley, the house uphill can put its ridge and chimneys between your lower panels and the low winter sun, while a slope facing the other way stays open. Two houses on one road can need different layouts. Further out, the stone houses around Ranmoor and Dore need a closer look at the roof itself. Natural stone slate is heavy, and artificial stone slate can look similar without fixing the same way, so we establish which you have before choosing a mounting system.
Battery position takes some thought too. A cellar is often cool and close to the incoming supply, but Hillsborough, Kelham Island and the Porter Brook corridor all have a flood history, 2007 being the one people remember. Defences have improved since, yet we would still look higher up the house in those areas. Scaffold beside a public road needs a council permit, currently £77 for a domestic property. The council’s guidance suggests chasing if you have heard nothing after 12 weeks, so that application goes in early.
We work across Nether Edge, Ecclesall, Crookes, Walkley, Hillsborough, Fulwood, Dore, Totley, Woodseats, Stannington and the rest of the city. Survey, design, scaffold, installation, commissioning and your MCS certificate all stay with us.
We also install in Chesterfield, Leeds and across Yorkshire, and there is more about the team on our about us page.
Industrial roofs make a strong case for solar, because a heavy daytime load uses the generation on site and exports very little of it cheaply. We design and install from 10 kWp up to 250 kWp. Older sheds through Attercliffe, Darnall and the Lower Don Valley are the ones to inspect first. A fibre cement roof may need an asbestos survey, and purlins put up decades ago were never sized with an array in mind.
Sizing starts from your half hourly consumption data, so the system follows the meter and not simply the available roof. Three phase design, G99 applications to Northern Powergrid, ballasted flat roof systems and pitched roof mounting are all covered. Procurement teams can also ask for our CHAS SSIP, Constructionline Gold and Cyber Essentials credentials.
Handover is when the useful life of a system begins. Panel warranties run for decades, but inverters are electronics and usually need attention first, and a dropped string can cost you generation for months without any visible sign. We monitor what we install, service it on request and handle warranty claims when a component fails. Sheffield also has form with wind, the 1962 gale still being the local reference point, so on exposed western roofs we check clamps, rails and cable fixings as well as the output figures.
If another company fitted your system and has since vanished, we can take it on. That covers fault finding, inverter replacement, panel cleaning, bird proofing, adding a battery to an array that was fitted without one, and completing export registration. Some older systems were never registered for the Smart Export Guarantee, which means the surplus has been going to the grid unpaid. Check that one first.
Usually not. Roof mounted panels on a house normally count as permitted development if they stay below the highest part of the roof and project no more than 200mm. The common exceptions are listed buildings, walls fronting a highway in a conservation area, and Article 4 properties in Nether Edge and Broomhill. We check your address before quoting.
It can. Sheffield City Council says houses in the Nether Edge and Broomhill conservation areas may carry an Article 4 Direction, which means planning permission for panels on a roof slope fronting a highway. A rear slope may avoid that. A separate Article 4 Direction on shared houses concerns how a property is used, not its roof.
Roughly a third of the city sits inside the Peak District National Park. There, including High and Low Bradfield, planning decisions rest with the Peak District National Park Authority and not the city council. The route can differ, so we confirm which authority covers your address first.
Northern Powergrid, which runs the local network across Yorkshire. The S postcode does not follow network boundaries, though. Around Chesterfield the operator changes to National Grid Electricity Distribution, so we confirm it from your address instead of assuming.
Under G98, a system up to 3.68kW per phase of inverter output is notified to the operator after installation. Anything larger falls under G99 and needs approval before it is switched on, which can take up to 45 working days. Inverter output decides this, not the number of panels.
Most domestic jobs run four to eight weeks from signing to generating, with one to two days on site. Grid approval or the scaffold permit usually sets the pace, so both applications go in early.
Start with MCS certification, because suppliers require it for the Smart Export Guarantee. Then ask who employs the engineers, whether someone will visit the roof, and how shading from nearby houses and the hillside was measured. A price given with no site visit cannot answer that last question.
Less than most people assume. PVGIS models about 940 kWh per kWp a year in Crookes at around 240 metres, against about 950 in Attercliffe at around 40 metres. Slope direction and nearby shading move the figure much more. High, exposed roofs do need fixings designed for the extra wind and snow load.
Typically 900 to 955 kWh per kWp a year on an unshaded south facing pitch at 35 degrees, so a 4.4 kWp array lands near 4,100 kWh. East or west slopes lose about a fifth. Those are PVGIS modelled figures with standard system losses, and your own shading gets measured at survey.
Sometimes. Cellars are cool and usually near the incoming supply, but we check flood risk, damp, ventilation and the manufacturer's limits first. Hillsborough, Kelham Island and the Porter Brook corridor have flooded before, so there we would normally look at a higher position or a weather rated external unit.
It depends on the supplier, not your region. The lower end pays a few pence per kWh. Flat rates open to most solar owners reach about 13p, deals tied to buying your electricity from the same supplier can reach 20p or more, and time of use tariffs pay more at peak but generally need a battery. Rates move often, so compare at commissioning.
Directly employed engineers, no call centre and no third party sales agency. We take on the grid application, the planning check and the scaffold permit, and if the hillside or the roof makes solar a poor buy, you will hear that from us before you spend anything.
We install domestic solar systems across:
These third-party seals of approval guarantee that your project meets the highest technical standards and current UK regulations.
Our friendly team is here to help with expert advice on solar panels, battery storage, or electrical services . No pressure, just honest answers.
Unit 3, Gainsborough Business Park Long Eaton, Nottingham NG10 1PX
Experienced solar, electrical & energy-efficiency specialists in Nottingham, with 25+ years of industry expertise.
Copyright © 2026 LJM Solutions. All rights reserved. Website and SEO by Vimana Digital (Web Design Nottingham)